Site Architect
قطر
منذ 6 يوم
source : تنقيب - TanQeeb
  • Review the tender & IFC drawings and discrepancies to be reported to PM / RE / Sr. Architect of the project within a maximum 3 weeks of project commencement.
  • Any constructability issues to be identified and reported. Any Request for Information related to specification, drawings, etc to be raised with the proposed solutions for confirmation from PM / RE / concern party.

  • Attend the factory visits, witness third party tests as directed by PM.
  • Review and comment on the Contractor material submission, shop drawings, record drawings, as built drawings, method statements, ITPs, 0&M manual, as per contract documents.
  • Release the documents within 7 days after the review and in coordination with other trade discipline engineers as required.

  • Review and provide comments on the baseline & other programme of works including schedule of submission of the project.
  • Attend inspection request in the same day (whenever possible) and release the comments on the same day.
  • Assist QS in monthly payment certification. Release the executed work percentages within 2 days of receipt of contractor submission.
  • Assist PM and QS in drafting related Site Work Instruction. Support the team to advise on the impacts.
  • Coordinate with other trade disciplines for smooth project progress.
  • Assist PM / RE / Sr. trade discipline in coordinating with the design team as and when required especially for confirming RFI responses.
  • Safety Audit / inspection to be executed when AEB HSE personnel not available in the project.
  • Weekly or Monthly brief work reports to be provided to PM as required.
  • Assist in preparing Client project reports.
  • Support the organization as required utilising the self multi skill knowledge / awareness.
  • Provide lessons learnt during the project closure.
  • Inspect and prepare snag list and do continuous follow up with the concern to close the issued snag.
  • Routine inspections to be carried out to ensure that the Contractor is executing the project as per the contract requirement.
  • Issue CAR’ or NCR’ in consultation with RE / PM as and when non-compliance is noted.

  • Actively participate in technical and progress meetings as requested by PM / RE.
  • Diplomatic business relationships to be maintained with all stakeholders (including the Contractors) of the project.
  • Continuously follow up and do all necessary for obtaining all statutory approvals for the project.
  • Comply to all circulars issued by AEB Management including GCEO, GCOO, CPO-CS, LPMs.
  • Pro-activeness in work to be followed during the work.
  • Keep update with QCS, statutory authority regulations, etc in regular basis.
  • Continuous professional development by attending related seminars, technical workshops, etc.
  • قدِّم طلب ترشيحك
    أضف الى المفضلات
    إزالة من الإشارات المرجعية
    قدِّم طلب ترشيحك
    بريدي الالكتروني
    بالضغط على "واصل" ، أعطي موافقة نيوفو على معالجة بياناتي وإرسال تنبيهات إلي بالبريد الإلكتروني ، على النحو المفصل في سياسة خصوصية لـ نيوفو . يجوز لي سحب موافقتي أو إلغاء الاشتراك في أي وقت.
    واصل
    استمارة الطلب